+1-877-SCI-FLOOR - [email protected] - Mon-Sat 8am-8pm CT IAAPA MemberEN | ES

Sci-Games Procurement: 7 Mistakes I Made So You Don't Have To

Marcus FeldmanOperator Notes

The Questions Procurement Teams Actually Ask (and the Answers That Cost Me Money to Learn)

I've been handling game equipment orders for B2B entertainment venues for five years. In that time, I've personally made—and documented—nine significant sourcing mistakes totaling roughly $11,000 in wasted budget. Now I maintain our team's 14-point vetting checklist, and I'm sharing the answers to the questions I wish I'd asked before learning things the hard way.

Here's what this covers: supplier red flags, hidden costs, product-specific pitfalls, and the one question nobody asks until it's too late.

1. What's the most common mistake when sourcing sci-fi board games with miniatures?

Not checking miniature scale compatibility across different game systems. In my first year (2017), I ordered a batch of sci-fi board games with miniatures for a client's tournament setup. The models looked amazing in the photos. Problem was, they were 28mm scale while the existing terrain the client owned was 32mm. Minis couldn't fit on the terrain bases. That error cost us $890 in redo costs plus a one-week delay.

The fix is simple: always ask the supplier for exact base dimensions and scale ratios. If they can't give you a spec sheet with measurements, that's a red flag. "Approximately 28mm" isn't good enough when you're outfitting a venue with hundreds of pieces.

2. How do you play the speed card game? Is it worth adding to a venue's rotation?

Speed is a two-player card game where you race to empty your hand by playing cards sequentially (ascending or descending) on the two central piles. Each player has five cards in hand, and you can have up to five face-up cards on your side. You refill your hand from your personal draw pile as you play. First to empty their draw pile and hand wins the round.

Here's the thing—it's deceptively simple. I once ordered 40 units for a venue thinking it'd be a quick rotation item. Turns out, the game's frantic pace made it a hit, but the cards wore out fast. Cheap card stock (under 300gsm) meant we replaced stock three times in six months. If you're buying for high-traffic use, pay extra for 310gsm+ linen-finish cards. That's not a sales pitch—it's $600 I spent learning that lesson.

3. What's the hidden cost with basketball arcade games?

The shipping and installation costs. Almost every quote I've seen lists the unit price, then tacks on "freight" as a separate line item that can add 15-25% to the total. A basketball arcade game that lists at $2,800 can easily land at $3,400+ once you factor in liftgate delivery, inside placement, and calibration.

I got burned in September 2022 when a "free shipping" promotion from a vendor turned out to exclude residential liftgate service. The venue was on the second floor of a commercial building with no freight elevator. That "free" delivery cost an extra $450 in specialized moving fees. Now I always ask: "Does your shipping quote include liftgate, inside delivery, and calibration?" in writing before signing anything.

4. I've seen aggravation board games listed under different names. What should I watch for when ordering?

Aggravation is a classic marble-race board game (similar to Sorry! or Ludo) that's been published under dozens of names since the 1960s. The problem is board quality varies wildly between manufacturers. I once ordered what was described as a "premium aggravation board game set" for a client—$65 per unit, 20 units. When they arrived, the marble holes were drilled unevenly. Marbles would get stuck. The client returned 14 of 20 units.

Lesson learned: for abstract strategy games like aggravation, always request a sample unit before bulk ordering. If the supplier won't send a sample (even at your cost), that's a deal-breaker. The $1,300 return shipping and restocking fees taught me that one.

5. What's the best way to evaluate sci-fi video games for a commercial venue?

Don't rely on trailers or store-page screenshots. I made that mistake in Q1 2024 with a batch of "best sci-fi video games" for a VR arcade expansion. The promotional footage looked incredible. But when we installed the units, three of the five titles had motion sickness complaints from players within the first week—a known issue with certain VR locomotion systems.

Now I check three things before buying any sci-fi video game for commercial use: (1) Does it offer teleport or snap-turn locomotion options? (2) What's the average session length before players report discomfort? (3) Are there independent reviews from commercial operators, not just home users? That third one alone would've saved us a $2,400 restocking hit.

6. What question do most buyers forget to ask suppliers?

"What's your replacement parts timeline?" Not price, not warranty length—the actual time it takes to get a replacement part when something breaks. A vendor can offer a "2-year warranty" but if replacement joysticks, buttons, or cards take six weeks to arrive, that warranty is meaningless for a venue losing money on a dead machine.

I learned this after a basketball arcade game's sensor failed in month four. The "warranty" covered the part, but it took 38 days to ship from overseas. That's 38 days of a $4,500 machine sitting dark. Now I ask for documented replacement timelines and keep a spare sensor on hand for every arcade unit we deploy. That spare cost $85. The downtime cost was way more than that.

7. Is there a checklist that actually prevents these problems?

Yes—and it's the cheapest insurance you'll ever buy. My 14-point checklist includes things like: request a sample unit before bulk orders, get shipping inclusions in writing, verify scale compatibility for miniature-based games, check card stock weight for high-traffic card games, and confirm replacement part timelines.

We've caught 47 potential errors using this checklist in the past 18 months. Estimating conservatively, that's saved us around $8,000 in potential rework, return shipping, and downtime. Five minutes of verification beats five days of correction—every single time.

One caveat: my experience is based on about 200 mid-range B2B orders in the entertainment venue space. If you're working with luxury installations or ultra-budget pop-ups, your mileage may vary. But the core principle—check before you buy—holds up no matter what segment you're in.

Leave a Reply